মূল পাতা
জাতীয়

Tk3,482cr Dasherkandi STP operating at 25% capacity due to lack of sewer connections

The Tk3,482 crore Dasherkandi Sewage Treatment Plant is currently operating at only 25% of its capacity due to a shortage of sewer connections.

TBS Bangladesh · 12 সেপ্টেম্বর 2026, 12:00 দুপুর

The Dasherkandi Sewage Treatment Plant (STP), constructed at a cost of Tk3,482 crore, is currently functioning at only 25% of its total capacity. This underutilization is primarily attributed to a lack of adequate sewer connections linking buildings to the municipal main lines. Without these essential connections, the facility remains unable to operate at its full designed potential.

তথ্যসূত্র: TBS Bangladesh